Pontiac Bonneville Club Photo Gallery

Pontiac Bonneville Club online photo album

Floor complete
This is the floor completed, it was painted with POR-15 and then sealed with 3M seam sealer.  As a last step, I pop riveted a thin piece of sheet metal (shown) where your feet rest.  It didn't need to be very strong, I just needed to fill in the hole.
Keywords: rust weld welding

Floor complete

This is the floor completed, it was painted with POR-15 and then sealed with 3M seam sealer. As a last step, I pop riveted a thin piece of sheet metal (shown) where your feet rest. It didn't need to be very strong, I just needed to fill in the hole.

307_on_ground.jpg IMG_4142_28800x60029.jpg 17_Floor_Complete_40percent.JPG 021.jpg P9090503.jpg